Low voltage infrastructure built to last

Beacon installs the foundation every marina needs. From power distribution to data cabling, we handle the details so your systems run clean and reliable.

Low Voltage Construction

Low voltage construction is where precision meets durability. Beacon has spent over two decades perfecting the craft of running power, data, and control systems through challenging waterfront environments. We don't cut corners on the infrastructure that keeps your operation running.

Features

The right foundation prevents costly failures and keeps your marina operating without interruption.

Corrosion resistant materials

Marine-grade conduit, cabling, and connectors designed to withstand salt air, moisture, and harsh waterfront conditions for long-term reliability.

Code compliant installation

Every run meets or exceeds local and national electrical codes, reducing risk, liability, and future compliance issues.

Future proof design

Built with extra capacity and clear pathways so you can add systems later without tearing out walls or redoing work.

What marina owners say

"Beacon ran our entire low voltage system in three weeks. No surprises, no rework. That's professional."
Marina manager, Florida
"Twenty years in this business and Beacon still sets the standard for clean, documented installations."
Operations director
Yacht club, Great Lakes

Beacon by the numbers

750+

Installations completed

22

Years in business

50

States served

FAQ

Common questions about low voltage construction for marinas.

What is low voltage construction

Low voltage systems carry power and data at safe levels for control and communication. This includes wifi access points, security cameras, gate controls, and dock power distribution. Beacon installs these systems with the same rigor as high voltage electrical work.

How long does installation take

Timeline depends on marina size and complexity. Most installations take two to four weeks. We work around your operating schedule and minimize disruption to daily operations.

Do you handle permits and inspections

Yes. Beacon manages all permitting and coordinates with local inspectors. You get a fully compliant system with documentation to prove it.

What if we need future upgrades

We design with expansion in mind. Extra conduit and capacity are built in so adding systems later is straightforward and cost effective.

Can you work with existing infrastructure

Often yes. We assess what you have and integrate new systems where possible. Sometimes a clean rebuild is smarter. We'll advise based on your situation.

Still have questions

Reach out to our team anytime.

Let's build it right

Beacon's low voltage crews are ready to design and install the infrastructure your marina deserves.